Non-Fuel Facility – Design & Build Works at 500 – MBZ City Ctr. Service Station in Abu Dhabi (P740)
Mohammed Bin Zayed City, Abu Dhabi
Design, supply and install of CFA PILING WORKS
KON executed CFA piling works for ADNOC Non-Fuel Facility – Design & Build project in Mohammed Bin Zayed City, Abu Dhabi. The scope included design, supply, and installation of piles, ensuring safe and reliable foundation performance. The project was carried out with meticulous planning, quality control, and strict adherence to safety standards.